This week was another that saw considerable progress on construction of both the storage depot and the clinic buildings, even as the head honchos of FHH – Dr. Wolf and Cherlie – were away on a brief trip to the U.S. 2 workers continued to make concrete blocks that will be used in the depot and clinic, the masons laid blocks for the depot walls, and others poured concrete for the pad footings of columns in the clinic. A few photos from the week:
- Storage Depot – 11/7
- Storage Depot – 11/8
- Storage Depot – 11/9 (AM)
- Storage Depot – 11/9 (PM)
- Storage Depot – 11/10
- Clinic – 11/10
- Freshly Poured Beam
- Placing Blocks in Depot, Laying Clinic Foundation
Here are some photos of construction on the storage depot and clinic from the past week:
- Laying Rebar for the Depot Floor
- Mixing Concrete
- Pouring the Depot Floor
- Blocks for Storage Depot
- Setting the String for Blocks
- Placing Blocks
- Half-finished Depot
- Pouring Footings for Clinic
- Storage Depot – 10/31
- Storage Depot – 11/1
- Storage Depot – 11/2
- Storage Depot – 11/3