Here are some photos of construction on the storage depot and clinic from the past week:
- Laying Rebar for the Depot Floor
- Mixing Concrete
- Pouring the Depot Floor
- Blocks for Storage Depot
- Setting the String for Blocks
- Placing Blocks
- Half-finished Depot
- Pouring Footings for Clinic
- Storage Depot – 10/31
- Storage Depot – 11/1
- Storage Depot – 11/2
- Storage Depot – 11/3